The workflow for setting up a project consists of:
•Installation & configuration of Settings folder system.
•Installation & configuration of ProjectSettings.txt
•Installation of project folder system
•Installation & configuration of project workspace (PCF) – optional
These steps are detailed below.
Note: The “General (Meters)” or “General (mm)” Project Workspace should be used when a project workspace is not required.
Direct link to this topic:
© 2013 Arup