Pros |
Cons |
Greater integration with other design data, such as geotechnical or infrastructure models in real world co-ordinates |
May need project seed file if real-world co-ordiates lie outside the ‘Solids Working Area’ (Refer to Co-ordinates and the SWA section below) |
Automatic scheduling for items in the real world positions (i.e Pile layouts, bridge abutments etc) |
Exchange with other software (such as GSA or ArchiCAD) may be limited by their co-ordinate system accuracy. |
Easier model re-use ( i.e CityModelling) |
View manipulation is more complicated |
|
|
|
|
Direct link to this topic: